Work Day Check List
2019 Work Day Projects
Work days start March 2nd at 10 am. Please text or call the person in charge if you can help and/or bring tools needed.
Paul - 660-473-5185
Change Oil in Equipment
Clip trees around pond
Brett - 660-864-5635
Clean up leaves
Lawn Care
Eric - 913-915-0354
Paint bleacher walkways
Paint lawn chair section
Bleacher repair
Jacob - 660-596-4971
Score tower floor
Brian - 660-631-4477
Clean Tech building
Clean and level scales
Kelly - 816-665-8298
Braces on score board
Tara - 660-815-2176
Terry - 660-525-1569
Clean Score Tower
Clean Sign in Shack
Clean Concession Stand
Kevin - 660-641-2552
Check parking lot lights
Check signal lights
Wiring in score tower
Submitted By: Tara Brewer